Industrial Park «Vorsino»

Production Placement Application

Project description

Was formed for placing industrial enterprises of different sectoral activity.

Situated in the North-West of Kaluga Region in the Borovsk district, on the border of Kaluga and Moscow regions.

Purpose of the project: accommodation enterprises from various industries

Ownership of the land: the ownership of LLC «Industrial Park» Vorsino»

Category:land industry

Investment:75.2 billion rubles.

Jobs:to date created 4105, it is planned to create 7,847 jobs.

Total industrial park area is - 2023 ha,

1484 ha granted to investors
62 ha allocated for communication corridors
480 ha disposable for production placement
(including 207 ha for low-rise construction)
Location

Project participants

The productions of KT&G Rus (LLC) (tobacco goods production), Samsung Electronics Rus Kaluga (LLC) (TV panels assembly), Nestle Russia (LLC) (production of pet-food)

Investment projects realization of the following companies on the territory of the park is begun:

  •  КНПЭМЗ (CJSC) - electrometallurgical plant,
  • Odysseyprom (LLC) - production of furniture,
  • Eurofloat Kaluga (CJSC) - production of plane glass,
  • Omega Liz Kaluga (LLC) - logistic center,
  • Vintraskom (LLC) - production of plastic tableware for airlines,
  • Onvest Kaluga (LLC) - logistic center,
  • Sormat Rus (LLC) - production of hardware,
  • Tuplex (LLC) - production of parquet underlayer,
  • YOUKONN (LLC) - production of polyester staple fiber,
  • John Deere Rus (LLC) - agricultural machinery production,
  • Triada-Impex (CJSC) - construction materials production
Infrastructure
POWER SUPPLY

Substation for investors’ power supply is put into operation. Distributing power station for is put into operation on the Eastern site. The contracts on technological joining of Northern and Eastern sites consumers are concluded.

GAS SUPPLY

The industrial park gasification is finished.

WATER SUPPLY AND DRAINAGE SYSTEM

Works on building industrial park’s water supply point and local treatment facilities are being carried out. Phased putting individual units into operation, taking into account the outlet on the estimated capacity (4000 cubic meters per day) is planned to be finished by 2011.

ROADS

Asphalt-covered roads were constructed on the Eastern site.

COMMUNICATION

Agreements on cooperation with leading operator Centertelecom (OJSC), Kaluga Region affiliated branch are concluded.

Terms of the placement in the industrial park
  • Placement for charge (calculated exactly  for every investor)